Siraha
2081/2082
Transportation of Cement including Load/Unload
Ton
5000.00
900.00
Siraha
2081/2082
Transportation of CGI sheet including Load/Unload
Ton
5000.00
1722.00
Siraha
2081/2082
Transportation of Rebar including Load/Unload
Ton
5000.00
1350.00
Siraha
2081/2082
Transportation of Wire mesh/Selvedge wire including Load/Unload
Ton
5000.00
1350.00
