Rasuwa
2081/2082
Transportation of Cement including Load/Unload
Ton
11120.00
500.00
Rasuwa
2081/2082
Transportation of CGI sheet including Load/Unload
Ton
11120.00
800.00
Rasuwa
2081/2082
Transportation of Rebar including Load/Unload
Ton
11120.00
800.00
Rasuwa
2081/2082
Transportation of Wire mesh/Selvedge wire including Load/Unload
Ton
11120.00
800.00