Pyuthan
2081/2082
Transportation of Cement including Load/Unload
Ton
1647.5
492.00
Pyuthan
2081/2082
Transportation of CGI sheet including Load/Unload
Ton
1965.00
555.55
Pyuthan
2081/2082
Transportation of Rebar including Load/Unload
Ton
1965.00
370.00
Pyuthan
2081/2082
Transportation of Wire mesh/Selvedge wire including Load/Unload
Ton
1965.00
250.90
