Panchthar
2081/2082
Transportation of Cement including Load/Unload
Ton
2100.00
320.00
Panchthar
2081/2082
Transportation of CGI sheet including Load/Unload
Ton
2700.00
550.00
Panchthar
2081/2082
Transportation of Wire mesh/Selvedge wire including Load/Unload
Ton
2875.00
550.00
Panchthar
2081/2082
Transportation of Rebar including Load/Unload
Ton
2875.00
550.00