Palpa
2081/2082
Transportation of Cement including Load/Unload
Ton
3063.00
280.00
Palpa
2081/2082
Transportation of CGI sheet including Load/Unload
Ton
3799.00
5000.00
Palpa
2081/2082
Transportation of Rebar including Load/Unload
Ton
3799.00
5000.00
Palpa
2081/2082
Transportation of Wire mesh/Selvedge wire including Load/Unload
Ton
3799.00
5000.00
