Makwanpur
2081/2082
Transportation of Cement including Load/Unload
Ton
800.00
400.00
Makwanpur
2081/2082
Transportation of CGI sheet including Load/Unload
Ton
800.00
200.00
Makwanpur
2081/2082
Transportation of Rebar including Load/Unload
Ton
800.00
200.00
Makwanpur
2081/2082
Transportation of Wire mesh/Selvedge wire including Load/Unload
Ton
800.00
200.00
