Kapilbastu
2081/2082
Transportation of Cement including Load/Unload
Ton
1750.00
400.00
Kapilbastu
2081/2082
Transportation of CGI sheet including Load/Unload
Ton
2250.00
140.00
Kapilbastu
2081/2082
Transportation of Rebar including Load/Unload
Ton
1750.00
140.00
Kapilbastu
2081/2082
Transportation of Wire mesh/Selvedge wire including Load/Unload
Ton
2250.00
140.00
