Jumla
2081/2082
Transportation of Cement including Load/Unload
Ton
11854.08
2963.52
Jumla
2081/2082
Transportation of CGI sheet including Load/Unload
Ton
14575.68
3643.92
Jumla
2081/2082
Transportation of Rebar including Load/Unload
Ton
14575.68
3643.92
Jumla
2081/2082
Transportation of Wire mesh/Selvedge wire including Load/Unload
Ton
14575.68
3643.92