Jhapa
2081/2082
Transportation of Cement including Load/Unload
Ton
3789.5
250.00
Jhapa
2081/2082
Transportation of CGI sheet including Load/Unload
Ton
3789.5
250.00
Jhapa
2081/2082
Transportation of Rebar including Load/Unload
Ton
3789.5
250.00
Jhapa
2081/2082
Transportation of Wire mesh/Selvedge wire including Load/Unload
Ton
3789.5
250.00
