Dolkha
2081/2082
Transportation of Cement including Load/Unload
Ton
5338.90
1334.72
Dolkha
2081/2082
Transportation of CGI sheet including Load/Unload
Ton
5338.90
1334.72
Dolkha
2081/2082
Transportation of Rebar including Load/Unload
Ton
5338.90
1334.72
Dolkha
2081/2082
Transportation of Wire mesh/Selvedge wire including Load/Unload
Ton
5338.90
1334.72
