Bara
2081/2082
Transportation of Cement including Load/Unload
Ton
4056.37
400.00
Bara
2081/2082
Transportation of CGI sheet including Load/Unload
Ton
4056.37
370.00
Bara
2081/2082
Transportation of Rebar including Load/Unload
Ton
4056.37
370.00
Bara
2081/2082
Transportation of Wire mesh/Selvedge wire including Load/Unload
Ton
4056.37
370.00
