Bajura
2081/2082
Transportation of Cement including Load/Unload
Ton
11101.44
2775.36
Bajura
2081/2082
Transportation of CGI sheet including Load/Unload
Ton
13650.24
3412.56
Bajura
2081/2082
Transportation of Rebar including Load/Unload
Ton
13650.24
3412.56
Bajura
2081/2082
Transportation of Wire mesh/Selvedge wire including Load/Unload
Ton
13650l.24
3412.56