Bajhang
2081/2082
Transportation of Cement including Load/Unload
Ton
209088.00
52272.00
Bajhang
2081/2082
Transportation of CGI sheet including Load/Unload
Ton
209088.00
52272.00
Bajhang
2081/2082
Transportation of Rebar including Load/Unload
Ton
209088.00
52272.0.0
Bajhang
2081/2082
Transportation of Wire mesh/Selvedge wire including Load/Unload
Ton
209088.00
52272.00
